Log Cabin Roof Renewal
A complete roof replacement to protect and preserve the log cabin.
High Ropes Restored
Renewed high ropes facilities with safer climbing walls, roof, and lifeline system.
New Tents
A full renovation and enlargement of our tents, including new fabrics and structures.
New Sound and Media System
A complete upgrade of sound and media equipment to improve every camp activity and gathering.
Kitchen Renewal
Complete renovation of the kitchen with new stainless-steel furniture and upgraded surfaces.
New Quad
Acquisition of a Yamaha Kodiak 700 to support maintenance and logistics.
New Counselors Tent
Complete renewal of the counselors’ tent with new fabric for durability and comfort.
Installation of Solar Panels
Installation of solar panels to provide sustainable and reliable energy.
Log Cabin Restoration
Comprehensive restoration of the log cabin, including utilities, access, and functional spaces.
Restoration of Teepees
Structural restoration of the teepees, including new wood and reinforced frames.
Teepees Fabric Change
Replacement of the teepee fabrics to improve durability and comfort.
Restoration of Entrance Door and Signs
Renovation of the main entrance door and camp signage for safety and appearance.
Reconstruction of the Big Tent electrical panel house
Complete reconstruction of the electrical panel house to ensure safety and reliability.
Expansion of the laundry area and improvements to the electrical system
Expanded laundry area with upgraded electrical system and boiler exhaust improvements.
Kamikace Fabric Renovation
Replacement of the Kamikace fabric to ensure safety, durability, and optimal performance.
New Shelves in the Big Tent
Installation of new shelves to organize and store materials used in the tent.
Repairing Washroom Showers Walls
Renovation of the shower walls to improve hygiene, durability, and comfort.
Varnishing and Protection of Bungalows
Application of varnish and protective treatments to preserve and maintain the bungalows.
Basketball Courts Electric Booth Restoration
Restoration of the electric booth at the basketball courts for safety and reliability.
Kitchen Exterior Improvements
Renovation of the kitchen’s exterior with septic system upgrades and a new fence.
Maintenance Management System Implementation
New system for maintenance requests, incident response, and preventive programs.
Pool Showers and Railings Repair
Repairs to the pool showers and restoration of the surrounding wooden railings.
Kitchen Hot Water Boiler Renovation
Replacement and renovation of the kitchen hot water boiler to ensure safety and efficiency.
Hot Water Boiler Area Repairs
Multiple repairs carried out in the hot water boiler area to ensure proper functioning and safety.
Firefighting Water Pressure System Incident Management
Repairs and management of incidents in the water pressure system for firefighting.
New Communications, Security & Storage System
Implementation of updated communication tools, security measures, and storage solutions across the facility.
Teepee Area Water Protection Repairs
Repairs around the teepees to prevent water entry during storms.
Kitchen Machinery Incidents and Repairs
Replacement of the cold room and repair of the kitchen extractor motor.
Counselors Tent Electrical System Repair
Repair of the electrical system in the counselors tent to restore safety and functionality.
Kitchen Sink Ceiling Enclosure
Installation of a ceiling enclosure above the kitchen sink as required by the 2024 health inspection.
Pool Incident Fixes & Procedures Documentation
Repairs in the pool area and creation of documented procedures for proper operation and safety.
Replacement of kitchen cutlery
Replacement of all kitchen cutlery to improve hygiene, durability, and daily operations.